  • HOME > Case Studies > Building Solutions > Okura Graden Hotel Shanghai

    Okura Graden Hotel Shanghai

    True goal is to spread the achievement of energy-saving measures throughout China

    The installation of the system and equipment for the project was completed by the end of May 2010, whereupon full operation commenced.

    “At present, we are making adjustments to some machines. In 2010, after the system went into operation, the energy cost was curtailed by more than 10% as compared to the first half-year of 2009. CO2 emissions also decreased by more than 10%. In view of these achievements, I believe that we can attain the target specified for this project, namely an energy-saving rate of 16% as compared to the 2006 level. Thanks to Expo 2010 Shanghai, our occupancy rate has increased significantly. With that in mind, I think the energy-saving result we have attained to date should be highly acclaimed,” says Mr. Yan.

    The energy-saving model project, jointly implemented by the Japanese and Chinese governments, is drawing considerable attention in China. In fact, the Okura Garden Hotel Shanghai is visited by many companies, not only Chinese companies planning to take energy-saving measures but also Japanese companies operating in China.

    “Our aim goes beyond merely achieving energy-saving effects in our hotel. We hope that the achievements obtained through the project will spread across China. That is our true goal,” says Mr. Yan.

    Yamatake-manufactured inverter control panels installed in the machine room. They optimize energy consumption by providing appropriate control according to the air-handling units and pump load demand.

    Yamatake-manufactured inverter control panels installed in the machine room. They optimize energy consumption by providing appropriate control according to the air-handling units and pump load demand.

    glossary

    *1 NEDO(New Energy and Industrial Technology Development Organization)
    Independent administrative legal entity of the Japanese Ministry of Economy, Trade and Industry.
    *2 BEMS (Building Energy Management System)
    A system designed to minimize the energy consumption for an entire building or plant by automating the monitoring and control of energy consumed by energy-using facilities and equipment including district heating/cooling equipment.
    *3 BACnet (Building Automation and Control Networking protocol)
    A communications protocol for networks for intelligent buildings. BACnet is used for the integrated control of various facilities and equipment, such as HVAC, lighting, access control, and fire detectors. This protocol enables the connection and monitoring of devices made by different manufacturers through a common interface

    Note: Some of the information for March 2012 and earlier may use the former names of azbil Group companies.
    This case study was published in the July 2011 issue of the azbil Group's corporate magazine, azbil.

    97亚洲色欲色欲综合网_快点吧啊下面都日出水了_韩国三级2021最新三级_国产乱伦视频